Get Price And Support

How Dumper Cost Vary With Increase In Depth Of Openpit Mine

  • Cost effectiveness in open-pit hard rock Ore Mining -

    Feb 25, 2011 · Cost effectiveness in open-pit hard rock Ore Mining. Fig. 2 The detonation of an explosive charge in a blast hole gives rise to a strong initial .

    Get Price »
  • Selection of Open-Pit Dump Trucks during Quarry Reconstruction

    Nowadays and in the near foreseeable future the quarry road transport will be the most common in the open-cut mining method. This is due to a range of advantages of open-pit dump trucks usage as compared with other types of quarry transport, i.e. autonomy, the possibility of using in any mining engineering and climatic conditions etc.

    Get Price »
  • Down in the hole: A photo tour of Australia's largest open .

    May 04, 2015 · The Super Pit is the largest open-pit gold mine in Australia. A canyon-size hole populated by house-size trucks, it's large enough to be seen from orbit. Here's what it looks like up close.

    Get Price »
  • Open Pit Mine Design, Planning & Engineering | Mining .

    Open Pit Mine Design, Planning and Engineering . and assessment of the West wall pushback needed to increase the pit depth from 700 to 1200 m. During this difficult project, we overcame many logistical and drilling challenges. . and prediction of environmental impacts at the Livengood open-pit gold mine in Alaska.

    Get Price »
  • Study on Buffer Zone Optimization between Open Pit and .

    Study on Buffer Zone Optimization between Open Pit and Dumping in Erdenet Mine in Mongolia . alongside the pit also gives an advantage to waste hauling cost. However, creating a waste dump alongside the pit should be planned well thus it does not give worse affect to pit . planning of the mine depth and amount of the waste dump material. The

    Get Price »
  • | 785D Mining Truck / Haul Truck |

    Optional oil renewal system extends engine oil change intervals from 500 hours to 4,000 hours or more to increase machine availability and reduce costs. . The X body is a heavy duty body configured with a variety of liner options to meet site specific requirements of a mine. Like the Dual Slope - the X body is designed for durability across a .

    Get Price »
  • Opencast Mining - an overview | ScienceDirect Topics

    A substantial increase in the rate of accumulation of waste dumps in recent years has resulted in greater height of the dump for minimum ground cover area and also given rise to danger of dump failures. Further, steeper open-pit slopes are prone to failure. These failures lead to loss of valuable human life and damage to mining machinery.

    Get Price »
  • Reduce ore dilution and loss in open pit mines | BMT

    Teck's Red Dog surface zinc mine adds US 6.5 million annually through blast monitoring. Centerra Gold's Mount Milligan open cast copper mine recovered over US 600,000 of ore in one blast. Anaconda Mining's Pine Cove gold mine reduced dilution from 20% to less than 5% and generated a 15% increase in recovered tonnes, valued at US 15-30k .

    Get Price »
  • Investigation of Excavator Performance Factors in an Open .

    etc. The data from such a dispatch system in Geita Gold Mine (GGM) as used w in this study to assess the productivity of the open-pit mine. Open-pit mine operation is an expensive business endeavor, with main cost components comprising of earth moving (or material transport) costs and heavy duty equipment investment, to mention a few.

    Get Price »
  • Government of India Ministry of Labour & Employment .

    Ministry of Labour & Employment Directorate General of Mines Safety DGMS (Tech.) (S&T) Circular No. 02 Dhanbad, Dated 06.07.2010 . Kimberly Diamond mine of M/s De Beers and Sandsloot Open Pit Platinum Mine of Mis. . Design mine and the pit as well as dump .

    Get Price »
  • Block size selection and its impact on open-pit design and .

    Block size selection and its impact on open-pit design and mine planning grade values of the elements of interest, not on the real (unknown) block grades. This inevitably implies that some high-graded blocks are underestimated and sent to dump, while other low-graded blocks are overes-timated and sent to the processing plant. This

    Get Price »
  • Basics of an open pit mine - Mine Engineer.Com

    The planning of an open pit mine is, therefore, basically an exercise in economics, constrained by certain geologic and mining engineering aspects. A bench may be defined as a ledge that forms a single level of operation above which mineral or waste materials are mined back to a bench face.

    Get Price »
  • ECONOMICS OF HIGH ANGLE CONVEYOR IN DEEP OPENCAST MINE

    Nov 01, 2015 · In opencast mining transport cost is the biggest cost element, which can be around 50 - 60% of total mining cost. Presently, opencast mining is done for a greater depth .

    Get Price »
  • Determination of Optimum Production Capacity and Mine Life .

    capacity and a mine life in the mine planning. In open pit mine planning, many factors affect total fixed and operating costs, such as haulage costs, particularly when the mine goes deeper, geomechanical features of the ore body and surrounding rocks, diggability and .

    Get Price »
  • Bildplatshållare Mine cost drivers - Boliden

    Two main types of mines Open pit mining Roughly ten times lower in cost per ton compared to under ground mining Slope stability decide waste/ore ratio With low grades a high production rate is needed Big equipment for high volume production Under ground mining Under ground mines commonly have lower production rate Increased cost to infrastructure and ground support

    Get Price »
  • Tailings - Wikipedia

    Tailings ponds can also be a source of acid drainage, leading to the need for permanent monitoring and treatment of water passing through the tailings dam; the cost of mine cleanup has typically been 10 times that of mining industry estimates when acid drainage was involved.

    Get Price »
  • Selection of Open-Pit Dump Trucks during Quarry Reconstruction

    Nowadays and in the near foreseeable future the quarry road transport will be the most common in the open-cut mining method. This is due to a range of advantages of open-pit dump trucks usage as compared with other types of quarry transport, i.e. autonomy, the possibility of using in any mining engineering and climatic conditions etc.

    Get Price »
  • Take a tour of the Super Pit: The largest open-pit gold .

    The Super Pit, in Kalgoorlie, is the largest open-pit gold mine in Australia, and one of the largest in the world. A canyon-size hole dug by house-size machines, it's large enough to be visible .

    Get Price »
  • Abstract - USGS

    Open pit models have a base-case cost equation for a specified haulage distance calculated in a manner discussed in the open-pit section. In addition to the base-case equations, another set of equations are provided with a factor for varying haulage distances. These factors are explained fully in the open pit section and in appendix B.

    Get Price »
  • Mining Costs - CAPEX vs. OPEX - UndervaluedEquity

    In general, underground mining is more expensive than open pit mining as with open pit mining the minerals are found near the surface at a maximum of approximately 200-400 meters depth in bulk tonnage.. The mining costs are estimated in a mining company's feasibility study which, when available, can be found on the company's website (often hidden between the news releases).

    Get Price »
  • Mining Flashcards | Quizlet

    The law was amended in 1990 to fund the reclamation of abandoned mines as well. This funding comes from a tax of 35 cents per ton of surface mined coal. SMCRA is enforced by state and federal government agencies. It focuses on cleaning up old mine sites and keeping acid mine drainage out of streams.

    Get Price »
  • Open Pit Mining Flashcards | Quizlet

    Open Pit Mining -refers to a surface mining method where an ore body is extracted in increments to its economic depth . -reduced bench heights increase support equipment requirements-reduced bench heights require more time for bench prep, drilling, and blasting . -cost of work outlined in mine plan-order parts and supplies and establish .

    Get Price »
  • Surface Coal Mining Methods in Australia

    x Low operating cost, and x Handles hard digging. The following are some of the disadvantages of a dragline: x Constraints on dig depth and dump height, x Relatively inflexible, x Requires detailed planning, and x High capital cost. The rigging on a conventional dragline weighs 20 tonnes and this has not changed in design in 100 years.

    Get Price »
  • Open pit mine planning considering geomechanical .

    rion, the methods of slope stability analysis and the aspects of open pit mine planning that are relevant to this work. Section 5 presents the case study and Section 6 presents and discusses the results of the application. Finally, Section 7 contains the conclusions of this research. Figure 1. Historical evolution of open pit mines' depth [4].

    Get Price »
  • Block size selection and its impact on open-pit design and .

    Block size selection and its impact on open-pit design and mine planning grade values of the elements of interest, not on the real (unknown) block grades. This inevitably implies that some high-graded blocks are underestimated and sent to dump, while other low-graded blocks are overes-timated and sent to the processing plant. This

    Get Price »
  • Sonic Drilling Depth Record with Less . - Boart Longyear

    Jan 19, 2017 · Boart Longyear Drilling Services took on the challenge of drilling core samples from the unconsolidated waste rock dump at Kennecott Utah Copper's Bingham Canyon Mine. The intent of the drilling was to define the contents of the waste rock dump. The waste rock dump consisted of rock blast material ranging in size from 254 to 304.8 millimeters (10 to 12 in) in diameter and was made up .

    Get Price »
  • Design of openpit mining - SlideShare

    Mar 13, 2012 · Contd.Haul analysisLead,lift increase cost – decides mode of transportDump limits available areDump area 100m from mine boundaryDump area 50 m from internal access road.Dump area 80-100 m. from mine infrastructureOB volumes - Final slopesMineable Reserves – various losses, batter, barrier etc. - dilution etc (0-1 m against Roof,floor .

    Get Price »
  • Curragh Coal Mine - Mining Technology | Mining News and .

    Curragh is an open-pit coal mine located 14km north-west of the town of Blackwater in the bowel basin of Central Queensland, Australia. The mine is operated by Wesfarmers Curragh, which bought the property from Stanwell in June 2000. The mine covers an area of 12,600ha and has an annual production capacity of 7Mt.

    Get Price »
  • Waste Rock Dump Management and Stability Evaluation

    Waste Rock Dump Management and Stability Evaluation D Olivier SRK The management of mine waste dumps has historically been assigned mainly to the on-site mining operations. In recent years, focus has turned to a more scientific approach to waste rock dump management and the auditing of these manmade structures.

    Get Price »
  • North East Openpit mining over West old workings

    Mine safety matters Openpit mining over old workings. Openpit mining over old workings During openpit mining, a relatively thin pillar of rock may be left between the unfilled void and . depth, whether the void has been backfilled, unusual drilling conditions, colour of cuttings

    Get Price »
  • Cost effectiveness in open-pit hard rock Ore Mining -

    Feb 25, 2011 · Cost effectiveness in open-pit hard rock Ore Mining. Fig. 2 The detonation of an explosive charge in a blast hole gives rise to a strong initial .

    Get Price »
  • World Largest Dumptruck At the Huge Coal Mine - English Russia

    Bachatsky open-pit coal mine is one of the largest mines of Kuzbas. Its annual output is over 8 million 700 thousand tons. It extract fuel for energetic and metallurgical fields of Russia and many other countries of the world. The mine uses 29 excavators, 63 dumpers, 9 .

    Get Price »
  • Optimization of Truck-Loader haulage system in an .

    the ramp design, traffic on the ramps, etc. These factors increase the cycle time of the hauling machine s. Reducing the cycle time would increase equipment effectiveness and mine output. This paper imulates s the haulage system in order to optimize number of trucks for the overall mine .

    Get Price »
  • Down in the hole: A photo tour of Australia's largest open .

    May 04, 2015 · The Super Pit is the largest open-pit gold mine in Australia. A canyon-size hole populated by house-size trucks, it's large enough to be seen from orbit. Here's what it looks like up close.

    Get Price »
  • Optimization of the loading and hauling J fleet at .

    furnace maintenance costs and increased furnace availability. (Van Antwerpen 2004.) (Figure 4.) Project background Manganese mining is one of the major mining activities taking place within the Kalahari region. Mamatwan Mine is currently the only open pit manganese mine in the region. According to the mine planners, this mine could produce up

    Get Price »
  • Mine Rehabilitation and Closure Cost

    Mine Rehabilitation and Closure Cost: A Hidden Business Risk 3 3 S U M M A R Y The accuracy of mine closure and rehabilitation liabilities can have a material impact on the valuation of a mining company. Closing the current generation of very large open pit operations across various commodities will

    Get Price »
  • Mine Shaft Sinking Costs

    The effect of most of these factors upon costs is self-evident, but effect of the rate of sinking is not so apparent. There is probably a certain rate of sinking that will vary somewhat with each job, which will result in the lowest cost per foot of shaft and below or above which this cost will increase.

    Get Price »
  • Diamond mine economics: production costs, margins & cash .

    GFMS Mine Economics is undertaking a program of global mine visits in order to gather the technical and operating data included in the new study. Besides an in-depth production cost breakdown, revenues, margins and forward-looking cash flows are presented for each operation.

    Get Price »
  • The mine planning process for an open-pit diamond mining .

    The mine planning process for an open-pit diamond mining operation Overhead costs Overhead (fixed) costs for Letseng mine mainly include senior management salaries, costs associated with running the mine site, and administration staff and offices costs. Overhead costs are expressed as time-related costs .

    Get Price »
  • Issues related to stability design of very high spoil dumps

    The aim of any open pit coal mine design is to provide the steepest possible excavation configuration that is commensurate with stability, safety and financial requirements. The economic depth for open cut coal mining, expressed as the 'strip ratio', is based on the unit revenue of the coal and the cost to recover it.

    Get Price »